Installation & User Manuals

PowerGuard commercial system installation instructions

PowerGuard CPM30-1W

Installation

Remove the lid of the unit and securely fit upright against a panel or wall with Fischer or

normal 4mM screws. The 4,5mM mounting holes are accessible through the rectangular

apertures on the four corners of the enclosure. Drill or punch 20mM holes at the bottom of

the enclosure to accommodate glands as required for wiring.

Set Up Instructions

After powering up the system, SW1 active will inhibit its load when overall demand falls

within the backlash range selected on the shed controller. This feature falls away when the

backlash transgression restores and only activates again after a power interruption. This

feature is essential for customers with a compromised electrical supply.

SW2 active responds to phase conscious shed requests, again essential for customers with a

compromised supply. Customers with adequate supply will realise an improved random

shed pattern with SW2 off.

SW3, 4 & 5 set the minimum shed period following a shed request. With these switches off,

the period is 1 minute and increases by 2,5 minutes for each additional binary bit added.

Total shed period is as follows: SW3=3,5; SW4=6; SW3+4=8,5; SW5=11; SW3+5=13,5;

SW4+5=16 and SW3+4+5=18,5 minutes.

SW6, 7 & 8 control the minimum time between accepting shed requests. These switches

together with switches 3,4&5 are essential for air conditioner control to ensure that the

occupant’s comfort levels are not compromised. With SW6,7&8 off, there is no lock-out

interval. SW6=15; SW7=30; SW6+7=45; SW8=60; SW6+8=75; SW7+8= 90 and SW6+7+8=105

minutes.

SW9 & 10 decide on how many CPM30-1W receivers, on average, should respond to a shed

request. For example, if 100 receivers are installed, all set to odds = 50, then approximately

2 units will shed for each shed request. With a total of 10 units, all set to odds = 10,

approximately 1 unit will shed for each shed request. Odds are manipulated such that a

recently shed unit will revert to maximum odds to allow other units to shed before it

responds to the next shed request. With both SW9&10 off, odds= 5; SW9= 10; SW10= 25

and SW9&10= 50. Odds can be decreased within a control grid to favour higher priority

loads or can be increased to protect lower priority loads.

PowerGuard DPM20-2 installation instructions & diagram

Powerguard Dpm20-2

Installation Instructions

1) Isolate power to the distribution panel by opening the main incoming breaker associated with the

relevant existing power meter and verify that the power is indeed switched off.

2) Retract the incoming feeder line to the distribution panel from the main breaker/isolator and

reconnect after feeding the wire through the large hole in the enclosed current transformer.

3) Position the DPM20-2 controller so that the control wires to the two relay outputs can be routed

conveniently.

4) If required, the Din-rail mounting clip can be removed by splitting the unit and sliding the

assembly out. No tools are required for this operation as gentle hand pressure is sufficient.

5) Cut the white wire loop from the current transformer to a convenient length and connect to the ‘CT

100:1’ terminal. It is important that no current flows through the transformer before these wires are

terminated as high voltages can be generated across the un-terminated output wires.

6) Referring to the enclosed ‘DPM20-2 INSTALLATION’ diagram, up to two 20 Amp loads not

exceeding 4,4KW resistive or 1 HP inductive and can now be connected according to the diagram

allowing CH2 to control the lowest priority (first to shed) load and CH1 to serve the highest priority

load. Use wire with 2,5mM cross sectional area minimum for the controlled loads. Care should be

taken when connecting neutral wires to pair them with the relevant earth leakage or non-earth

leakage buss when connecting to the relevant controlled loads. Both relay contacts are

completely isolated.

7) A maximum total current of up to 99 Amps can now be programmed on the two rotary switches

marked ‘SET MAX. CURRENT’. This setting would typically be the value of the main incoming

isolator or circuit breaker.

8) 230 Vac can now be connected to the terminals marked ‘230 VAC INPUT’, observing the line and

neutral designation. This supply must be protected by an independent 5 Amp circuit breaker and

taken from the non-earth leakage supply bus. A flashing blue LED light indicates power as well as

main processor activity.

9) After four to six minutes, provided that there is sufficient power available (approximately 15

Amps), CH1 will switch on and if current reserve allows, CH2 will follow in approximately 1.5

seconds. Closed contacts are indicated by their respective green LED’s.

10) As soon as the total current drawn by the distribution board exceeds the value programmed in

step no 7, CH2 relay contact will open for a minimum of 15 minutes and then only restore power

to its load as supply becomes available again. Should demand continue to increase during this

period, CH1 will also shed, again only to restore after 15 minutes if power is available.

POWERGUARD DPM20-8 installation instructions & diagram

PowerGuard DPM20-8

Installation Instructions

Rev. 1.1

E info@poweroptimal.com

W www.poweroptimal.com

1. Isolate power to the distribution panel by opening the main incoming breaker associated with the relevant

existing power meter and verifying that the power is indeed switched off.

2. Retract the incoming feeder line to the distribution panel from the main breaker/isolator and reconnect

after feeding the wire through the large hole in the enclosed current transformer.

3. Position the DPM 20-8 controller so that the control wires to the RL1 relays can be routed conveniently.

4. Cut the white wire loop from the current transformer to a convenient length and connect to the ‘CT 100:1’

terminals. It is important that no current flows through the transformer before these wires are terminated.

5. Referring to the enclosed ‘DPM20-8 INSTALLATION’ diagram, up to eight RL20-1 relays can be controlled

from one DPM20-8. The RL20-1 relays in turn can control 8 x 230 Vac line loads not exceeding 4kW resistive

or 1 HP inductive and can now be connected according to the diagram allowing no. 8 to control the lowest

priority (first to shed) load and no. 1 to serve the highest priority load. Use wire with at least 2.5mm² cross

sectional area for the controlled loads. Care should be taken when connecting neutral wires to pair them

with the relevant earth leakage or non-earth leakage buss when connecting to the RL20-1 relays.

6. A maximum total current for the board can be programmed on the two rotary switches marked ‘SET MAIN

MAX. CURRENT’. This setting would typically be the value of the main incoming circuit breaker or isolator.

Also set the ‘SET S/BY MAX. CURRENT’ switches to a value that the standby generator can deliver

continuously, de-rating for high altitude installations. These settings can be verified on the LCD display.

7. The two contacts marked ‘S/BY’ can be short circuited by potential-free contacts to switch from main to

standby load control setting.

8. 230 Vac can now be connected to the terminals marked ‘230 VAC INPUT’, observing the line and neutral

designation. This supply must be protected by an independent 5-amp circuit breaker and taken from the

non-earth leakage supply busses. A flashing blue led light indicates power as well as main processor activity.

9. After four to six minutes, provided that there is enough power available (approximately 15 Amps at 230Vac),

CH1 will switch on. Again, if current reserve allows, CH2 to CH8 will switch on in approximately 1.5 second

steps.

10. The LCD display indicates active outputs as well as the total current consumption.

11. As soon as the total current drawn by the distribution board exceeds the maximum current value

programmed in step no. 6, CH8 contact will open for a minimum of 15 minutes and then restore power to

its load as supply becomes available again. Should demand continue to increase during this period, CH7 to

CH1 will also shed and after 15 minutes restore the lowest numbers, again depending on availability of

power.

12. Blue LED lights on the RL1 relays indicate power while green LED lights indicates active output to the

relevant load.

Directors: RA Fearon, FS Moolman, JJ Theron, DM Weber (Independent), IR Jandrell (Independent)

Company registration number: 2012/099947/07 PO Box 39521, Capricorn Square, Cape Town, 7948

PowerOptimal PowerGuard Commercial Range User Manual v1.5

img-001.png

img-002.png

PowerGuard Commercial Range User Manual

Version number: 1.5

Author(s): Dr. Sean Moolman

Mr. Johan Theron

General contact: sean.moolman@poweroptimal.com

082 788 1615

Technical contact: johan.theron@poweroptimal.com

083 600 1827

Address: PO Box 39521

Capricorn Square

7948

Cape Town

Table of Contents

Table of Contents 2

1. PowerGuard unit operation 3

1.1 System operation 3

1.2 LCD screen readout 5

1.3 Settings on the PowerGuard Controller 5

1.4 Settings on PowerGuard Receivers 7

1.5 LED light codes / meanings 7

2. Online monitoring 9

2.1 How to log in 9

2.2 Landing page 9

2.3 How to view & interpret graphs 11

2.4 How to view & interpret the dashboard 12

2.5 Estimated monthly savings 14

3. Basic troubleshooting 15

Appendix A. Front face of PowerGuard CPM30-1W Single Channel Receiver 17

Appendix B. Front face of CPM16-30 16-Channel Receiver 18

1. PowerGuard unit operation

The PowerGuard system is fully automated and has been designed to require no user intervention.

1.1 System operation

The below simplified diagram shows how the PowerGuard system is connected to a facility’s electrical system.

img-003.png

The PowerGuard Controller measures the total incoming current using current transformers installed on the incoming power line(s) (either single phase or 3 phase). It also measures the average voltage on the incoming power line(s).

Based on the measured current and voltage values, the Controller calculates the power demand (in kVA) for the facility. This value (total power demand of the facility) is displayed on the LCD screen.

a. Normal operation

Based on the preset control level, the PowerGuard Controller will start sending out shed requests to all the Receivers (PG R in the diagram). Each Receiver has its own pre-set settings that determine how it will respond to the controller – specifically, how regularly it should switch off (probability of responding), for how long it should switch off, and for how long after a previous switch-off it should not switch off again (see Section 1.4).

The Controller will continue to send shed requests until the power demand stabilises at a level below the control level.

This simple configuration allows a lot of flexibility in how the facility can be managed, and effectively distributes switch-off of loads across the facility in a balanced manner. (However, it is not necessary to change ANY settings once the system has been commissioned and configured by PowerOptimal. The overall control level can be changed if there are substantial changes to occupancy or circumstances, but no other settings need to be changed.)

The facility can be controlled either at a maximum current value (A) or a maximum demand value (kVA). This setting is found on the Controller (see Section 1.3). Whether it is controlled at maximum current value or maximum demand value is determined by the main purpose of the system – i.e. is it to (i) alleviate power supply constraints, or (ii) reduce demand charges. Note: this setting is typically only configured once (during installation) by PowerOptimal, and there is no need to change it.

(i) Power supply constraints – control at maximum current (A)

If the facility has power supply constraints (e.g. experiencing power trips), control at a maximum current value is more suitable, since loads will then only be shed on the phase that requires reduction in current to avoid power trips. The online monitoring system can be used to determine whether load balancing across the phases can be improved – e.g. if one notes that a specific phase is the main or only cause of shedding, loads can be moved from that phase to another phase.

(ii) Reducing demand charges – control at maximum demand (kVA)

When demand charge (electricity cost) reduction is the main purpose of the system, then it is better to control the facility’s power use on a maximum demand (kVA) basis, since this is what demand charges are calculated on by the utility / municipality.

b. Time of use settings

The system can be configured to manage at three different control levels based on input from timers: ‘normal’, and two time of use settings. It can also be configured to completely switch off all loads at certain times. Please speak to a PowerOptimal representative if you wish to implement any of these settings. It will require installation of one or more timers.

c. Backup power setting

The system can be configured to automatically detect when there is a switch to backup power, and to manage at a different control level on backup power. Please speak to a PowerOptimal representative if you wish to configure the system for backup power management.

d. Power failures

When power returns after a power failure, the system will wait four minutes for the power to stabilise, and then it will systematically switch on the loads in a staggered manner, in order to avoid the cold pick-up power demand spike.

All controlled loads are protected against under- and overvoltage, and will be switched off should such an event occur.

1.2 LCD screen readout

img-004.pngimg-005.png

Current – White line (A)

Total demand (kVA)

Current – Red line (A)

Current – Blue line (A)

Average voltage (V)

1.3 Settings on the PowerGuard Controller

On the next page is the front face of the PowerGuard Controller.

The only setting that should be changed by the user under normal circumstances is the Shed Level (circled in red). Just turn the dials with a screwdriver to select the control level. The numbers read as one would a normal number (e.g. dial settings 0 – 1 – 0 – 5 would be 105 kVA or amps).

The other settings are configured during installation & commissioning and should not be altered.

img-006.png

1.4 Settings on PowerGuard Receivers

See Annexure A for the front face of the CPM30-1W receiver and Annexure B for the front face of the CPM16-30 receiver. No settings should be or need to be changed by the user.

1.5 LED light codes / meanings

Controller

The following LED lights are present on the PowerGuard Controller for monitoring and diagnostic purposes:

img-007.png

The LED lights have the following meanings:

Name

Colour

Meaning

On

Flashing

Off

Processor Heart Beat

Green

NA

Processor operational

Processor not operational / no power

Shedding on Red Phase

Red

NA

1 sec – in backlash range

2 sec – shed

4 sec – shed all

No shed signal being sent at specific point in time

Shedding on White Phase

Yellow

NA

1 sec – in backlash range

2 sec – shed

4 sec – shed all

No shed signal being sent at specific point in time

Shedding on Blue Phase

Blue

NA

1 sec – in backlash range

2 sec – shed

4 sec – shed all

No shed signal being sent at specific point in time

Shed Signal Quality

(only indicates whilst shed signal is being sent)

Red-Green bi-colour

If both colours are visible – good signal

NA

Off or only one colour visible – poor signal / faulty condition

Shed All Request

Orange

Shed all request active

NA

NA

Receiver

The PowerGuard Single Channel Receiver (CPM30-1W) has a single small light window on the front of the cover for diagnostic purposes. The light position is indicated below.

img-008.png

Indicator light window

The indicator light window indicates the following:

Colour & mode

Meaning

No light

No power

Red and blue lights

(a) Alternating – processor active / power on

(b) Slow-down / temporary stop in speed or rhythm of alternating – receiving shed instruction

Green light

Power available to load

2. Online monitoring

The PowerGuard system has a built-in modem and sends measurements to the PowerOptimal database every half hour. The database is accessible via Energy Cybernetics’ Powerwatch front-end.

2.1 How to log in

  1. Go to: www.cpowerwatch.com
  2. Click on the “Sign In” button at the top right of the screen.
  3. Enter your username and password as provided during installation.

2.2 Landing page

Upon login, you should see a screen similar to the below:

img-009.png

The blue band on the left-hand side contains the functionality for your site. If you hover over the symbols, text will appear indicating the function for that button.

img-010.png

img-011.pngClick on the “Graph Page” button to view near-real time graphs of your system.

img-012.png

Click on the “Personalised Dashboard – PowerOptimal” button to view a dashboard of system performance.

img-013.png

2.3 How to view & interpret graphs

Below is a screenshot of the graph page:

img-014.png

1. Select site

4. Navigate graph

3. Select what data to display

2. Select date range

  1. Select your site from the drop-down list;
  2. Select the date range that you want to view;
  3. Select the data that you want to display on the graph;
  4. You can navigate the graph in several ways. For example, you can hover over a data point to see the values at that time. You can select a date range on the graph itself by clicking anywhere on the graph and keeping the mouse button pressed whilst moving the mouse horizontally across the graph. You can also drag the bottom date selection left and right to view other / different dates.

2.4 How to view & interpret the dashboard

Below is a screenshot of the dashboard page:

img-015.png

2. Select date range

5. Summary data on maximum demand

4. Graph of peak demand and shed requests

3. 24-hour (daily) demand profiles

1. Select site

  1. Select your site from the drop-down list;
  2. Select the date range that you want to view;
  3. You can see a set of 24-hour demand profiles and shed requests on the right-hand side.
  4. Bottom left is the graph for the selected date range, showing the highest number of sheds in a 30-minute period for the day, as well as the highest demand (in kVA) for the day.
  5. The boxes in the middle indicate the maximum kVA and estimated savings for the selected date range. (Note: maximum demand charge is applied once per billing period, so to see the estimated savings for a specific billing period, use the start and end date of that billing period as the date range.)

Below is a close-up of the above graph:

img-016.png

The orange columns indicate the highest number of shed requests in any 30 minute period on the specific date (with values on the right vertical axis), whilst the lines indicate the highest actual (blue) and estimated (dark red) kVA values for the specific date. The grey horizontal line indicates the control level of the PowerGuard unit.

You can hover over the graph to see specific values.

This graph and the small daily graphs on the right makes it easy to see the functioning of the PowerGuard system and provides a ready overview of the total demand of your facility. As the total demand approaches the peak demand level, the system starts to shed in order to maintain overall demand below the peak level.

The difference between the “Actual kVA” and “Estimated kVA” lines is the estimated kVA reduction achieved by the PowerGuard system on that day.

2.5 Estimated monthly savings

You can use the PowerOptimal Dashboard (discussed in Section 2.3) to obtain an estimate of the monthly savings achieved through the use of PowerGuard.

img-017.png

4. Estimated kVA & financial savings for the month / billing period

3. Select date range

2. Estimated kVA reduction per shed

1. Site setup

  1. Click on the gear icon and check that the data is correctly configured for your site:

img-018.png

The demand charge tariff that you are being charged by Eskom or your municipality

The maximum demand level that the PowerGuard system is controlling your site at

  1. Check the estimated kVA reduction per shed request for your site. Note: This value is configured by PowerOptimal during the initial commissioning and calibration of the system. You don’t need to change this number.
  2. Set the date range that you wish to look at (you should preferably set the date range to coincide with the billing date range on your electricity bill).
  3. Now you can read off the estimated savings in kVA and rands for the specific date range (billing period)!

3. Basic troubleshooting

Below is a table with basic troubleshooting tips. If you cannot resolve the problem using the below table, please contact your electrician or give us a call!

Issue

Possible causes

What to do

Water from the hot water tap is cold.

a. Geyser problem

b. PowerGuard control level is set too low.

a. Call electrician to fix the geyser

b. Increase PowerGuard control level on the Controller (see Section 1.3)

Air conditioner does not switch on again after a shed

The air conditioner has not been configured to switch on after a shed, or someone has changed the air conditioner settings.

See your air conditioner manual on how to change the settings to switch on automatically when power is returned.

I cannot log in on the PowerWatch online monitoring site.

Incorrect username and password.

Please check your username and password, or contact PowerOptimal for assistance.

We have unusually high activity at our facility, and I want to increase the maximum demand level.

Increase PowerGuard control level on the Controller (see Section 1.3)

Demand peak has increased – shed instructions seem not to have effect on peak demand level (loss of control)

Possible communication problem between controller and receivers

At a quiet time, reduce the PowerGuard control level on the controller to a very low level, and confirm reception of shed signal on each receiver as indicated by blue-red LED on the receiver slowing down its speed of flashing.

Troubleshooting the online monitoring graphs

Issue

Possible causes

What to do

System is not on air

1. Hardware disconnected (no power to PowerGuard controller)

2. SIM card off air

3. Modem faulty

4. Software problem (database / online monitoring software)

Wait for two hours and log in again. If problem persists:

1. Check if power is on at controller, and if the controller is functioning (see Section 1.5).

2. Call PowerOptimal to remotely test the modem, check if sim card is loaded and check the back-end software.

Gaps in data

1. Cell phone network problems

2. SIM card problems

If the gaps occur repeatedly, contact PowerOptimal to check SIM card.

Strange patterns / behaviour (e.g. very high shed activity for a long period; no shed activity over a few weeks / month; demand exceeds control level)

1. Change in electricity use (e.g. change in occupancy, behaviour, expansion of the facility, etc.)

2. Someone has changed the peak demand level control setting on the controller.

3. Communication problems between controller and receivers.

4. Faulty controller / receiver.

1. First check whether the controller is functioning (see Section 1.5), and whether it is still set at the correct peak demand control level (see Section 1.3).

2. Check communication between controller and receivers by (at a quiet time) reducing the PowerGuard control level on the controller to a very low level, and confirming reception of shed signal on each receiver as indicated by blue-red LED on the receiver slowing down its speed of flashing.

Appendix A. Front face of PowerGuard CPM30-1W Single Channel Receiver

img-019.png

Appendix B. Front face of CPM16-30 16-Channel Receiver

img-020.png